Thursday, July 31, 2014

A little more progress.  The base plates for the ama tubes are in and the drain fitting hole has been drilled in each ama.  I should be able to glue in the tubes tomorrow and have the decks on the next day.

 
The centerboard, centerboard trunk and several other parts are getting the final coats of epoxy and should be ready for installation by the end of the week.
 
The next challenge is the mast tube.  I've changed direction here and decided to use the Hobie TI tube and mast/sail.  I already have the TI mast and sail so why not.  I need to fabricate a base for the tube and a plate for the roller bearings.



 



No comments:

Post a Comment